Is My 200A Panel Overloaded? Do the Math

A 200A 120/240V service delivers 48,000 VA, but continuous loads are limited to 80% โ€” plan around 160A usable. With an existing calculated load of 80A, you have roughly 80A of headroom: enough for a 30A dryer, a 20A shop circuit, and lighting, but a 50A EV charger plus electric range needs a proper load calculation first. Here is how electricians stack it.

Step-by-Step Takeoff

  1. 1

    List every load at nameplate watts, or read the existing calculated load (80A example).

  2. 2

    Total existing load in amps at 240V: 80A example leaves 200 โˆ’ 80 = 120A of breaker space on paper.

  3. 3

    Apply demand and the 80% continuous rule: continuous portion must fit under 160A total service.

  4. 4

    Add the new circuit at nameplate: EV charger 50A + dryer 30A + shop 20A = 100A new on top of existing.

  5. 5

    Compare: 80 existing + 100 new = 180A < 200A service, but check the continuous slice against 160A โ€” shed or sequence loads if over.

  6. 6

    Balance big 120V loads across both hot legs so neither leg overloads first.

  7. 7

    Model it exactly in the Electrical Calculator panel-load panel, including GFCI/AFCI breaker requirements.

๐Ÿงฎ Electrical ยท Open calculator
Electrical ยท More guides โ†’

Guide FAQ

Does a 200A panel give 200A per leg?

A 200A 240V service is 200A per hot leg, 48 kVA total; balance large 120V loads across both legs.

When do I need a service upgrade?

When the calculated load (with demand factors) exceeds the service rating, or the panel is full with no listed tandem space.

What size wire for a 50A EV charger?

6 AWG copper on a 60A breaker for continuous 48A charging (80% rule on a 60A circuit).

Can I add a subpanel instead of upgrading?

Yes if the service has headroom โ€” a 100A subpanel off a 200A service is routine.

Do tandem breakers add capacity?

No โ€” they add spaces, not amps. The service calculation governs regardless of slot count.