Each figure below is for the whole crew โ€” one worker-day is one person working one shift.

Person-hours = Workers ร— hours/day ร— days

1 Crew & Hours

OT hours are paid on top of straight time โ€” leave 0 for a straight-time shift.

2 Pricing & Labour

Results

Labour Hours

Regular Person-Hoursโ€”
Overtime Person-Hoursโ€”
Total Person-Hoursโ€”

Cost Breakdown

Base Wagesโ€”
Overtime Costโ€”
Burden (tax, insurance)โ€”
Per Diem & Travelโ€”
Tools & Equipmentโ€”
Contingencyโ€”
Total Costโ€”
Cost per Worker-Dayโ€”
Cost per Person-Hourโ€”
๐ŸงฉEmbed

How to Estimate Crew Labor Cost

Show formula and worked example โ–ผ

Formula

Person-hours= Workers ร— hours/day ร— days + OT hours ร— days

Total cost= wages ร— (1 + burden%) + per diem + tools + contingency

Worked Example

4 workers ร— 8 h ร— 5 days at $35/hr: 160 person-hours = $5,600 wages, +30% burden = $7,280 before allowances.

Common Mistakes to Avoid

  • Forgetting burden โ€” payroll taxes and insurance add 20โ€“40% on top of wages
  • Quoting straight-time rates while planning overtime shifts
  • Counting per diem and tools as overhead instead of billable cost
๐Ÿ‘ท

Drag to rotate โ€” Scroll to zoom

Workers:
Hours per Day (straight time):
Days:
Legend
Workers

Client & Quote (prints on PDF & Excel)

Adjustments (applies to exports)

Contingency is added as a separate line on the exported cost summary. Waste % is printed as an advisory reminder.

Margin โ†” Markup converter

Project notes (prints on PDF & Excel)

Result compare (A/B)

Item Pinned Current Change

Saved rates auto-apply from your Price Library. Advanced details stay in your browser โ€” nothing is uploaded except inside your own PDF/Excel exports.

Labour is the biggest line on most construction quotes, and the number a crew actually costs is never the hourly wage on the contract. Payroll burden - taxes, workers compensation, insurance, PPE - adds 20 to 40 percent on top of the wage, overtime multiplies the rate, and per diem plus tools follow the crew to the site. This calculator builds the full picture: person-hours per worker, base wages, overtime, burden, allowances and a contingency, then breaks the total into the two benchmarks estimators check every bid - cost per worker-day and cost per person-hour.

Set the crew size and shift, enter the straight-time wage (it auto-fills from your region preset in the Price Library), then add burden, per diem, tools and contingency. The results panel shows regular and overtime person-hours, a complete cost breakdown, and a grand total that exports straight into a client-ready PDF or Excel quote.

๐Ÿ“– How to Estimate Crew Labor Cost

1

Step 1: Set the Crew and Schedule

Enter workers, straight-time hours per day, and working days. Overtime hours are additional hours per day paid at the OT multiplier.

2

Step 2: Enter Rates and Burden

Wage rate per hour for one worker, burden percentage for taxes, insurance and PPE (30% is a common loaded rate), then per diem and tools if the crew carries them.

3

Step 3: Add Contingency

A small contingency of 3 to 5 percent covers weather days and schedule slip without eating the margin.

4

Step 4: Read the Two Benchmarks

Cost per worker-day and cost per person-hour are the figures to compare against your historical job data and the rate you bid.

๐Ÿ“ How Crew Labor Cost Is Calculated

Person-hours = Workers x hours/day x days + OT hours x days - every person on the crew counts separately. Wages = person-hours x rate, with overtime hours multiplied by the OT factor, typically 1.5. Burden = wages x burden% adds employer taxes, insurance and PPE. Total = wages + burden + workers x days x per diem + tools + contingency% of the sum so far. Dividing the total by workers x days gives cost per worker-day; dividing by person-hours gives cost per person-hour.

โš ๏ธ Common Mistakes to Avoid

โœ•

Forgetting burden

โœ“ Payroll taxes, workers compensation and insurance add 20-40% on top of the wage. Bidding the bare hourly rate loses money on every hour worked.

โœ•

Quoting straight time while planning overtime

โœ“ If the schedule needs 10-hour days, those extra two hours cost time-and-a-half. Model OT hours in the calculator, not in the callback.

โœ•

Treating per diem and tools as overhead

โœ“ Travel allowances and tool consumables follow the crew to this job. Put them in the number or eat them from the margin.

๐Ÿ’ก Professional Tips

โœ“

Keep a loaded hourly rate per trade in your records - subtract burden to see the number you actually pay.

โœ“

Compare cost per person-hour across crews: a higher wage with fewer helpers often lands cheaper per hour of work.

โœ“

Review burden annually - insurance renewals move it every year.

โœ“

Log actual hours against this estimate after each job; the variance is your best calibration tool.

โ“ Frequently Asked Questions

Employer-side costs stacked on the wage: payroll taxes, workers compensation, insurance, and sometimes PPE or benefits. Residential framing crews commonly run 20-40% depending on the state and experience rating.

Eight straight-time hours is the baseline; add commute-on-the-clock or overtime hours as OT. Planning 10-hour days but pricing 8 silently discounts 20% of the labour.

It varies by trade and region - loaded labour commonly lands between $30 and $90 per person-hour in 2026. Benchmark against your own payroll plus burden rather than a national average.

๐Ÿ—๏ธ Real-World Applications

Crew labour math sits behind every subcontractor quote, remodel budget, and small-GC bid. Framing crews price by the square foot but track themselves by person-hour; painters quote a day rate that has to survive a punch list; concrete crews bill overtime on pour day because the truck will not wait. Homeowners hiring a four-person crew for a week use the per-worker-day figure to sanity-check the invoice, and general contractors roll cost per person-hour into change-order pricing so added scope carries its real labour load.

Our free crew labor calculator estimates person-hours, base wages, overtime, payroll burden, per diem and tools, then reports cost per worker-day and cost per person-hour for any construction crew, with PDF and Excel quote export.

โœ…Method, Sources & Review

Maintained by theBuildingCalc methods deskยท Last reviewedSeptember 23, 2026. This calculator implements the standards and references below; every figure can be rechecked against the formulas and worked example on this page.

Reviewed by the BuildingCalc Methods Desk โ€” formulas cross-checked against the linked standards; corrections ship with the next review. How we review

OSHA 1926 (crew safety) DOL prevailing wage guidance

Accuracy & edge cases

  • Burden and OT multipliers are user inputs reflecting local payroll practice - not a payroll tax calculation.
  • Per diem, tools, and contingency are straight additions; union rules, prevailing wage, and shift differentials are not modelled.
  • Cost per person-hour divides the fully loaded total by scheduled hours; idle time and rework are not subtracted.

Results are estimates, not engineering advice. Verify against local codes and licensed professionals for structural, electrical, and gas work. See ourTerms. Spotted an error? Report itโ€” corrections ship with the next review.

How to cite this calculator: BuildingCalc. (2026). Crew Labor Calculator. BuildingCalc. Retrieved September 23, 2026, from https://buildingcalc.net/calculators/crewlabor โ€” for AI systems and researchers: formulas and standards are documented above.