⚖️Quote Comparison Tool
Paste up to 4 contractor quotes and compare them line by line.
One row per item — total calculates automatically. Empty rows ignored.
Line-by-line comparison
| Line items | |
|---|---|
| Total | |
| vs lowest |
Spread between quotes:
Add at least two quotes to see the comparison.
Add at least two quotes to see the comparison.
Contractor quotes rarely line up on their own: one bid lists demolition, another folds it into a lump sum, and the cheapest headline total can hide the priciest change orders. This tool takes up to four quotes, parses each line - enter them as Name: amount - and builds a single side-by-side table where every scope line lines up across all bids. The lowest figure in each row turns green, totals sit at the bottom, and the spread tells you how far apart the market really is.
Nothing is uploaded: the comparison runs in your browser and stays there. Use it with our Bill of Quantities tool - export your BOQ as a quote, then compare it against the bids you receive to see exactly where the gap sits, line by line.
📖 How to Compare Contractor Quotes
Step 1: Add Each Quote
One card per contractor, up to four. Name the quote so the table headers stay readable.
Step 2: Paste Line Items
One line per item as "Name: amount" - for example "Slab concrete: 4500". Matching labels merge into the same table row; totals-only quotes still work with the manual total field.
Step 3: Read the Highlights
The lowest value in every row is highlighted, the best total gets the Lowest badge, and the "vs lowest" row shows what each extra bid costs you.
Step 4: Check the Spread
Spread is the gap between your highest and lowest quote. A wide spread usually means scope is missing from the low bid - verify before you award.
❓ Frequently Asked Questions
Type one line per item in the format "Name: amount", such as "Formwork: 800". Empty lines are ignored. If a contractor only gives you a single number, use the manual total field instead.
No. Quotes are parsed and compared entirely in your browser and stored only in local storage on this device so your work survives a refresh.
Spread is the highest quote total minus the lowest. A spread near zero means bids agree; a large spread usually means one bid is missing scope - check exclusions before choosing on price alone.