Skip to content
All Guides
🪨 Worked Example
⏱ 1 min read

How Much Gravel for a Driveway?

Gravel is ordered by the cubic yard but priced by the ton, and the two confuse everyone once. A 20×40 ft driveway at 4 inches needs just under 10 cubic yards — about 13–14 tons of crushed stone. This guide converts once, clearly, then covers base prep and delivery so the truck shows up ready.

💡 At a Glance

A 20×40 ft driveway at 4 in needs 9.9 cu yd — about 13.8 tons of crushed stone, plus a compacted base underneath.

ƒx Key Formula

Tons = (L × W × depth ÷ 27) × ~1.4 tons per cu yd for crushed stone

Step-by-Step Takeoff

  1. 1

    Measure length × width and confirm depth: 4 in (0.333 ft) of surface stone.

  2. 2

    Volume: 20 × 40 × (4 ÷ 12) = 267 cu ft ÷ 27 = 9.9 cu yd.

  3. 3

    Weight: 9.9 × ~1.4 tons/yd (crushed stone) ≈ 13.8 tons.

  4. 4

    Base first: 4–6 in of compacted crusher-run, crowned 1/2 in per foot for drainage.

  5. 5

    Order 10 yards; confirm whether your quarry sells by yard or by ton.

  6. 6

    Schedule tailgate spreading if the truck can drive the path — it beats wheelbarrows.

  7. 7

    Compare base rock vs decorative stone pricing in the Gravel Calculator.

🧮 Gravel · Open calculator
Gravel · More guides →

⚠️ Common Mistakes

  • 1

    Ordering surface stone only — the driveway fails without the 4–6 in compacted base course below it.

  • 2

    Assuming a yard and a ton are the same — crushed stone runs 1.3–1.5 tons per yard; confirm with the quarry.

  • 3

    Spreading without a crown — flat gravel drains to the middle and stays wet; crown it 1/2 in per foot.

Guide FAQ

How many tons per cubic yard of gravel?

About 1.3–1.5 tons for crushed stone; pea gravel runs lighter. Always confirm with the quarry.

How deep should a gravel driveway be?

4 inches of surface stone over 4–6 inches of compacted base.

How much does a truckload of gravel cover?

A tri-axle hauls 20–25 tons — roughly 700–900 sq ft at 4 inches deep.

Crushed stone or pea gravel for driveways?

Crushed angular stone locks together under tires; pea gravel migrates and ruts.

How often to top up a gravel driveway?

Every 2–3 years with an inch of fresh stone, plus annual grading of washboard spots.

Related Guides

Results