Skip to content
BuildingCalc logo BuildingCalc
All Guides
๐Ÿ›ฃ๏ธ Worked Example

How Many Tons of Asphalt for a Driveway?

A 20ร—40 ft driveway at 3 inches compacted needs 14.5 tons of hot mix โ€” order 15 to 16 with waste. At roughly $110 per ton plus delivery, material runs about $1,700 before labor and base. This guide shows the tonnage math, the base it sits on, and when an overlay beats full removal.

Step-by-Step Takeoff

  1. 1

    Measure length ร— width and confirm compacted thickness (3 in = 0.25 ft).

  2. 2

    Volume: 20 ร— 40 ร— 0.25 = 200 cu ft.

  3. 3

    Tons: 200 ร— 145 รท 2000 = 14.5 tons; order 15โ€“16.

  4. 4

    Base: 4โ€“6 in of compacted crushed stone underneath (separate order).

  5. 5

    Check drainage fall (1/4 in per foot away from the garage) before the paver arrives.

  6. 6

    Compact edges first, then roll in overlapping passes while the mat is above 175F.

  7. 7

    Get the full quote with labor in the Asphalt Calculator.

๐Ÿงฎ Asphalt ยท Open calculator
Asphalt ยท More guides โ†’

Guide FAQ

How thick should a driveway be?

3 in compacted over base for cars; 4 in for RVs and heavy equipment.

Can I pave over old asphalt?

Yes with 1.5โ€“2 in overlay if the base is sound โ€” alligator cracking means full removal.

How much does an asphalt driveway cost?

Roughly $4,000โ€“$8,000 installed for 800 sq ft depending on base work and region.

How long before driving on new asphalt?

24โ€“48 hours for cars; a week before heavy trucks or sharp jack stands.

When is the paving season?

Above 50F ambient and rising โ€” cold mats ravel at the edges.

Advertisement
Ad space โ€” activates after AdSense approval

Related Guides