Skip to content
All Guides
🛣️ Worked Example
⏱ 1 min read

How Many Tons of Asphalt for a Driveway?

A 20×40 ft driveway at 3 inches compacted needs 14.5 tons of hot mix — order 15 to 16 with waste. At roughly $110 per ton plus delivery, material runs about $1,700 before labor and base. This guide shows the tonnage math, the base it sits on, and when an overlay beats full removal.

💡 At a Glance

A 20×40 ft driveway at 3 in compacted needs 14.5 tons of hot mix — order 15–16, with the base counted separately.

ƒx Key Formula

Tons = L × W × thickness (ft) × 145 pcf ÷ 2000

Step-by-Step Takeoff

  1. 1

    Measure length × width and confirm compacted thickness (3 in = 0.25 ft).

  2. 2

    Volume: 20 × 40 × 0.25 = 200 cu ft.

  3. 3

    Tons: 200 × 145 ÷ 2000 = 14.5 tons; order 15–16.

  4. 4

    Base: 4–6 in of compacted crushed stone underneath (separate order).

  5. 5

    Check drainage fall (1/4 in per foot away from the garage) before the paver arrives.

  6. 6

    Compact edges first, then roll in overlapping passes while the mat is above 175F.

  7. 7

    Get the full quote with labor in the Asphalt Calculator.

🧮 Asphalt · Open calculator
Asphalt · More guides →

⚠️ Common Mistakes

  • 1

    Paving over alligator cracking — that is base failure; mill and rebuild or the pattern returns in one season.

  • 2

    Skipping the compacted stone base — thin asphalt on soft ground ruts within a year.

  • 3

    Letting the mat cool below 175°F before rolling — compaction must finish while the mix is hot.

Guide FAQ

How thick should a driveway be?

3 in compacted over base for cars; 4 in for RVs and heavy equipment.

Can I pave over old asphalt?

Yes with 1.5–2 in overlay if the base is sound — alligator cracking means full removal.

How much does an asphalt driveway cost?

Roughly $4,000–$8,000 installed for 800 sq ft depending on base work and region.

How long before driving on new asphalt?

24–48 hours for cars; a week before heavy trucks or sharp jack stands.

When is the paving season?

Above 50F ambient and rising — cold mats ravel at the edges.

Related Guides

Results