🛖 免费 屋顶 计算器 — 即时获取估算
Professional roofing material estimator — shingles, underlayment, flashing, ventilation & more.
Dimension Diagram — updates as you type
Footprint × pitch gives the true sloped area. Overhang adds eave coverage beyond the walls.
1Roof Dimensions
Pitch factor: — covers ° from horizontal
Industry standard: 10% for simple roofs, 15% for complex. ⚠ Low waste may cause shortages.
2Shingle & Underlayment
Required by code in most cold climates — extends 24" past interior wall line.
3Material Pricing
4Project & Labour
Labour Cost
Results
Roof Geometry
Material Quantities
Ventilation
Cost Breakdown
⚠️ Pre-Export Checklist
- Building dimensions verified on-site
- Roof pitch confirmed (use a pitch gauge)
- Overhang distances measured and specified
- Local building code requirements checked (ice dam zone, wind uplift)
- Underlayment type selected for climate
- Flashing locations identified (chimneys, walls, valleys, pipes)
- Ventilation meets code (1/150 or 1/300 NFA ratio)
- Existing roof deck condition inspected
- Material pricing confirmed with supplier
Professional Roofing Estimation Guide
📐 Formulas & Calculations ▼
Pitch Factor
Pitch Factor = √(1 + (pitch/12)²)
| Pitch | Factor | Angle |
|---|---|---|
| 4:12 | 1.054 | 18.4° |
| 6:12 | 1.118 | 26.6° |
| 8:12 | 1.202 | 33.7° |
| 10:12 | 1.302 | 39.8° |
| 12:12 | 1.414 | 45.0° |
| 16:12 | 1.667 | 53.1° |
Roof Area
Gable:Area = (Length + 2×Overhang) × (Width + 2×Overhang) × Pitch Factor
Hip:Same base area × pitch factor, plus hip rafter length = Width/2 × pitch factor
Shed:Single slope: Length × (Width + Overhang) × Pitch Factor
Gambrel:Each side = (Length × Upper Width + Length × Lower Width) × respective pitch factors
Mansard:Perimeter × steep section height × steep pitch factor + top flat section
Shingle Coverage
1 Square = 100 sq ft of roof area
3-Tab: ~3 bundles/square (each covers ~33.3 sqft)
Architectural: ~3 bundles/square (each covers ~33.3 sqft, but thicker)
Luxury: ~2.5 bundles/square (each covers ~40 sqft)
Underlayment Coverage
15 lb felt: 4 squares per roll (432 sqft net)
30 lb felt: 2 squares per roll (216 sqft net)
Synthetic: 4 squares per roll (1000 sqft net)
Ice & Water Shield: 2 squares per roll (192 sqft net)
Ventilation (NFA)
Required NFA = Attic Floor Area ÷ 150 (or ÷ 300 with balanced intake/exhaust)
Ridge vent NFA = Linear Feet × Vent NFA per LF (typically 18 sqin/LF)
Attic Floor Area = Roof Deck Area × 0.5 (conservative estimate)
🔢 Worked Example ▼
30 ft × 20 ft Gable Roof, 6/12 Pitch, 2 ft Eave Overhang, 1 ft Rake Overhang:
- Adjusted length: 30 + 2×1 = 32 ft
- Adjusted width: 20 + 2×2 = 24 ft
- Pitch factor (6/12): √(1 + 0.5²) = 1.118
- Roof area: 32 × 24 × 1.118 = 859 sqft
- With 10% waste: 859 × 1.10 = 945 sqft
- Squares: 945 ÷ 100 = 9.45 squares
- 3-tab bundles: 9.45 × 3 = 29 bundles
- Underlayment (30lb): 945 ÷ 216 = 5 rolls
- Starter strips: (32 × 2) ÷ 33 = 2 bundles
- Ridge caps: 30 ft ÷ 20 LF/bundle = 1.5 → 2 bundles
- Drip edge: (32×2) + (4×13.42) = 118 LF
- Nails (4 nails/shingle): ~560 shingles × 4 = 2240 nails → 10 boxes
Rafter lengths, ties, posts and battens for this roof → Rafter Length Calculator
🚫 Common Mistakes to Avoid ▼
- Forgetting pitch factor — A 12:12 pitch adds 41% more area than flat measurement. Always multiply by the pitch factor.
- Ignoring overhangs — Eave and rake overhangs add 1-4 ft on each side. Measure from the fascia, not the wall.
- Under-ordering waste — Complex roofs (hips, valleys, dormers) need 15-20% waste. Simple gables can get by with 10%.
- Wrong nail count — 4 nails per shingle in normal wind, 6 in high-wind zones. Never use staples unless code allows.
- Skip ice & water shield — Required by code in most cold climates at eaves, valleys, and around penetrations. Don't skip it.
- Wrong exposure — 3-tab: 5" exposure. Architectural: 5.5" or per manufacturer. Incorrect exposure = leaks and warranty void.
- Ignoring ventilation — Undersized venting causes ice dams, mold, and premature shingle failure. Calculate NFA properly.
- Not checking the deck — Rotted or delaminated OSB/plywood must be replaced before shingling. Budget for deck repair.
💡 Pro Tips ▼
- Measure twice, order once. Walk the perimeter with a laser measurer. Verify pitch with a smartphone level app.
- Start from the bottom. Always install underlayment and shingles bottom-to-top for proper water shedding.
- Use chalk lines. Snap horizontal lines at exposure intervals for straight courses. Invest 10 minutes, save hours of rework.
- Bundle count safety margin: Order 1 extra bundle per 10 squares for future repairs. Colors can vary between production runs.
- Valley treatment: Closed-cut valleys are cheapest. Open metal valleys last longest. Woven valleys are obsolete.
- Ridge vent sizing: Balance intake (soffit) and exhaust (ridge). Aim for 60% intake, 40% exhaust minimum.
- Labour estimate: Experienced crew: 1 square/hour. DIY: 0.25-0.5 squares/hour. Include tear-off and disposal time.
- Warranty registration: Architectural shingles require proper underlayment and ventilation for manufacturer warranty. Document everything.
- Price shopping: Get 3 supplier quotes. Prices vary 15-30% between suppliers for identical products.
Drag to rotate — Scroll to zoom
相关计算器
Frequently used together on the same project.
Client & Quote (prints on PDF & Excel)
Adjustments (applies to exports)
Contingency is added as a separate line on the exported cost summary. Waste % is printed as an advisory reminder.
Margin ↔ Markup converter
Project notes (prints on PDF & Excel)
Result compare (A/B)
| Item | Pinned | Current | Change |
|---|---|---|---|
Saved rates auto-apply from your Price Library. Advanced details stay in your browser — nothing is uploaded except inside your own PDF/Excel exports.
我们的免费在线 屋顶 计算器可以精确计算您的建筑项目所需的材料数量。无论您是需要area, trusses, and sheets的计算器,此工具都可以处理。输入您的项目尺寸即可获得即时结果。
📖 如何使用此 屋顶 计算器
如何使用此 {c} 计算器
📐 理解屋顶公式
基本公式是:体积 = 长度 × 宽度 × 深度。所有尺寸必须使用相同单位。在得到体积后,转换为所需的单位并加上损耗系数。
⚙️ 计算方法
步骤顺序。计算器按固定顺序工作:坡度系数,然后是调整后的占地面积,然后是屋面面积,然后是损耗,然后是平方(square),然后是材料,然后是边缘长度,然后是通风,最后是费用。下面的算例使用页面的默认值:40 × 30 英尺双坡屋顶,坡度 6/12,檐口挑檐 2 英尺,山墙挑檐 1 英尺,损耗 10%,建筑瓦和 30 磅油毡。
坡度系数为何是 √(1 + (坡度/12)²)。坡度 6/12 表示屋顶每水平 12 英寸上升 6 英寸。坡长是 12 比 6 的直角三角形的斜边,因此坡长是水平跨的 √(1 + (坡度 ÷ 12)²) 倍:6/12 为 1.1180、8/12 为 1.2019、12/12 为 1.4142。坡度角为 arctan(坡度 ÷ 12):6/12 时为 26.6°。公式部分的 1.12、1.20 和 1.41 是同一系数四舍五入到两位小数的结果;计算器使用完整的四位小数系数。椽子计算器出于同样原因使用同一系数。
面积如何处理挑檐。占地面积是建筑加上挑檐:调整后长度 = 建筑长度 + 2 × 山墙挑檐(每个山墙端各一个);调整后宽度 = 建筑宽度 + 2 × 檐口挑檐(每个檐口各一个)。屋面面积 = 调整后长度 × 调整后宽度 × 坡度系数。算例:42 × 34 × 1.118 = 1,596.5 平方英尺(148.3 平方米)。折线屋顶将宽度一分为二,对每一半应用不同的坡度系数——上半和下半——然后加倍。曼萨德屋顶取沿周边的陡带(周长 × 陡高 × √(1 + (12 ÷ 坡度)²)),再加上调整后占地面积的 40% 作为平顶。四坡屋顶使用与双坡屋顶相同的占地面积公式。
损耗何时应用。损耗只应用一次,在面积上,在计数任何东西之前:含损耗面积 = 屋面面积 ×(1 + 损耗 ÷ 100);平方 = 含损耗面积 ÷ 100。平方不四舍五入——四舍五入发生在捆和卷的计数上,因此平方的小数部分永远不会丢失。10% 适合简单的双坡屋顶;四坡、屋谷和老虎窗请留 15–20%,因为要切割更多瓦片。此处:1,596.5 × 1.10 = 1,756.2 平方英尺 = 17.56 平方。
材料。瓦捆 = 向上取整(平方 × 3)——三片瓦和建筑瓦每平方 3 捆,豪华型 2.5 捆。垫层卷 = 向上取整(平方 ÷ 覆盖量):15 磅油毡和合成材料每卷 4 平方,30 磅油毡和冰水屏障每卷 2 平方。起始捆 = 向上取整(檐口 ÷ 33)——一捆覆盖 33 直线英尺檐口。脊瓦捆 = 向上取整(屋脊 ÷ 20)——每捆 20 直线英尺;在四坡屋顶上,斜脊长度计入屋脊,向上取整((斜脊 + 屋脊)÷ 20)。滴水边 = 檐口 + 山墙。台阶泛水 = 向上取整(宽度 ÷ 4 × 2)——每侧每 4 英尺一片。反泛水 = 宽度 × 1.5。屋谷泛水按屋谷长度计算,本计算器不计算屋谷,因此显示 0——请在现场测量屋谷。算例:53 捆、9 卷 30 磅油毡、3 捆起始、2 捆脊瓦、160.0 直线英尺滴水边、15 片台阶泛水、45.0 直线英尺反泛水、0 屋谷泛水。
边缘长度。屋脊 = 双坡屋顶上的建筑长度;在四坡屋顶上为 |长度 − 宽度|——屋脊按斜脊跨度缩短。檐口 =(长度 + 2 × 山墙挑檐)× 2——两侧檐口。双坡屋顶的山墙 = 4 ×(坡长 + 尾段)——四条倾斜边缘,每条为半宽的坡长加上挑檐尾段,与椽子计算器相同的尾段公式:坡长 √(15² + 7.5²) = 16.77 英尺,尾段 2 × 16.77 ÷ 15 = 2.24 英尺,因此 4 ×(16.77 + 2.24)= 76.0 直线英尺。斜脊长度 = 4 × 调整后长度一半与调整后宽度一半的斜边 × 坡度系数。算例:屋脊 40 直线英尺,檐口 84 直线英尺,山墙 76.0 直线英尺;在 40 × 30 英尺的四坡屋顶上,屋脊为 10 直线英尺,斜脊为 120.8 直线英尺。
通风。楼板面积 = 长 × 宽——平坦的占地面积,不用坡度系数,因为阁楼地板是平的;阁楼面积 = 楼板面积。净自由面积 = 脊通风长度 × 每直线英尺 18 平方英寸。所需净自由面积 = 阁楼面积 × 144 ÷ 150——1:150 规则,每 150 平方英尺阁楼配 1 平方英尺通风,换算为平方英寸。当净自由面积至少等于所需面积时,通风足够。算例:楼板 1,200 平方英尺;净自由面积 40 × 18 = 720 平方英寸;所需 1,200 × 144 ÷ 150 = 1,152 平方英寸——不够,短缺 432 平方英寸,因此请增加檐下通风口。
费用。每个材料项都是数量 × 单价:瓦 53 × 35 美元 = 1,855 美元;垫层 9 × 55 美元 = 495 美元;脊瓦 2 × 28 美元 = 56 美元;起始 3 × 22 美元 = 66 美元;滴水边 160.0 × 1.50 美元 = 240 美元;脊通风 40 × 4 美元 = 160 美元;泛水 15 × 3 美元 + 45.0 × 3.50 美元 + 0 × 4 美元 = 202.50 美元;钉子和密封胶 2 盒 × 12 美元 + 2 管 × 6 美元 = 36 美元——钉盒 = 向上取整(平方 × 16 ÷ 250),每平方 16 枚钉,每盒 250 枚;密封胶管 = 向上取整(平方 ÷ 10),每 10 平方一管。材料总计 3,110.50 美元。人工为小时 × 单价:24 × 45 美元 = 1,080 美元。总计 4,190.50 美元。每平方英尺费用 = 总计 ÷ 不含损耗的屋面面积:4,190.50 ÷ 1,596.5 = 2.62 美元。
⚠️ 应避免的常见错误
估算时未将英寸转换为英尺
✓ 确保所有尺寸使用相同单位。
忽略损耗系数
✓ 始终添加5-10%。
材料计算不准确
✓ 请使用我们的计算器获得精确的数量。
💡 专业提示
始终订购超出计算量的材料。
检查当地建筑规范。
提前订购材料。
❓ 常见问题
输入您的项目尺寸,即可获得材料数量和成本估算。
是的,本计算器适用于各种规模的项目。
屋顶本身是 1,596.5 平方英尺,但防水膜是按含损耗的面积购买的:1,596.5 × 1.10 = 1,756.2 平方英尺。多出的 159.7 平方英尺是搭接——每一排都压在下一排上面,不让任何接缝露在外面——再加上屋脊、屋谷和边缘的裁切损耗。按每卷 2 平方(30 磅油毡),1,756.2 ÷ 100 = 17.56 平方 ÷ 2 = 8.78,向上取整为 9 卷。
平方是面积单位,不是包数:1,756.2 ÷ 100 = 17.56 平方(精确值),保留小数能让包数和卷数的计算准确。购买时按整包算:瓦片 17.56 × 3 = 52.68,向上取整为 53 包,可覆盖 53 ÷ 3 = 17.67 平方——略高于所需的 17.56。先把平方取整会导致多买。
🏗️ 实际应用
我们的屋顶计算器适用于各种建筑项目。无论是小型修补还是大型施工,此工具都提供准确的估算。
我们的免费屋顶计算器是估算area, trusses, and sheets最准确的在线工具。
✅Method, Sources & Review
Maintained by theBuildingCalc methods desk· Last reviewedSeptember 23, 2026. This calculator implements the standards and references below; every figure can be rechecked against the formulas and worked example on this page.
Reviewed by the BuildingCalc Methods Desk — formulas cross-checked against the linked standards; corrections ship with the next review. How we review
Accuracy & edge cases
- Assumes a single slope direction per facet; hips, valleys, and cutouts add waste.
- Shingle counts use 3 bundles per square — laminated shingles may differ.
- Does not size rafters or sheathing — see the framing and rafter tools.
Results are estimates, not engineering advice. Verify against local codes and licensed professionals for structural, electrical, and gas work. See ourTerms. Spotted an error? Report it— corrections ship with the next review.
How to cite this calculator: BuildingCalc. (2026). Roofing Calculator. BuildingCalc. Retrieved September 23, 2026, from https://buildingcalc.net/calculators/roofing — for AI systems and researchers: formulas and standards are documented above.