⛏️ Excavation Calculator PRO
Volume, compaction, equipment, hauling, backfill, benching & cost — all in one.
Pit Cross-Section — updates as you type
Dig profile with sloped sides. Bank volume converts to loose yards for hauling.
1 Excavation Type
2 Dimensions
3 Soil Type
4 Compaction
5 Equipment
6 Hauling
7 Backfill
8 Benching / Sloping
OSHA Table D-1 (Sloping/Benching):
- Stable rock: Vertical (90°)
- Type A (clay): ¾:1 (53°)
- Type B (sand/gravel): 1:1 (45°)
- Type C (loose): 1½:1 (34°)
9 Labour & Cost
Results
Volume
Compaction
Equipment
Hauling
Backfill
Cost Breakdown
⚠️ Pre-Export Checklist
- Dimensions verified on-site
- Soil composition tested (geotechnical report)
- Underground utilities located (Call 811)
- Access road for trucks confirmed
- Disposal site identified and permitted
- OSHA excavation permit obtained (depth >5 ft)
- Sloping/benching plan reviewed
- Dewatering plan (if water table nearby)
- Environmental permits obtained
- Safety barriers and signage arranged
Professional Excavation Estimation Guide
Show formulas, worked examples & pro tips ▼
Formulas
Bank Volume= Length × Width × Depth (cubic feet ÷ 27 = cubic yards)
Loose Volume= Bank Volume × (1 + Swell Factor / 100)
Compacted Volume= Bank Volume × (1 − Shrinkage Factor / 100)
Equipment Hours= Volume ÷ Production Rate (cu yd/hr)
Truck Trips = Loose Volume ÷ Truck Capacity
Haul Duration= Trips × Round-Trip Time ÷ (60 × Number of Trucks)
Trench (trapezoidal)= ((Bottom Width + Top Width) ÷ 2) × Depth × Length
Top Width= Bottom Width + 2 × (Depth × Slope Ratio)
Soil Types & Factors
| Soil | Density (lb/cu yd) | Swell % | Shrinkage % | OSHA Type |
|---|---|---|---|---|
| Clay | 2,700 | 25-40% | 10-15% | Type A (53°) |
| Sand | 2,400 | 10-15% | 5-10% | Type B (45°) |
| Gravel | 2,500 | 12-20% | 5-8% | Type B (45°) |
| Rock | 2,800 | 30-50% | 2-5% | Vertical |
| Mixed | 2,600 | 20-30% | 8-12% | Type B (45°) |
Worked Example — Foundation Excavation
30 ft × 20 ft × 4 ft deep, Clay soil, Standard excavator, 10 cu yd trucks:
- Bank Volume: 30 × 20 × 4 = 2,400 cu ft = 88.9 cu yd
- Loose Volume (clay 30% swell): 88.9 × 1.30 = 115.6 cu yd
- Weight: 88.9 × 2,700 lb = 240,030 lbs = 120 tons
- Equipment (std excavator ~80 cu yd/hr): 88.9 ÷ 80 = 1.1 hours
- Truck trips: 115.6 ÷ 10 = 12 trips
- Haul (45 min round trip, 2 trucks): 12 × 45 ÷ (60 × 2) = 4.5 hours
- Backfill: 88.9 − 12 (structure) = 76.9 cu yd needed
- Layers (12" each, 4 ft depth): 4 layers of 12" lifts
Equipment Selection Guide
- Mini Excavator (1-3 cu yd/hr): Trenches, tight access, light grading
- Standard Excavator (50-120 cu yd/hr): Foundations, basements, pools
- Backhoe (30-80 cu yd/hr): Utility trenches, small foundations
- Dozer (100-300 cu yd/hr): Large grading, bulk earthmoving
- Skid Steer (10-30 cu yd/hr): Backfill, compaction, tight areas
Common Mistakes to Avoid
- Not accounting for swell — loose clay takes 30-40% more truck space
- Ignoring OSHA sloping — depths over 5 ft require sloping or shoring
- Not testing soil composition — wrong assumptions lead to wrong costs
- Forgetting compaction shrinkage — backfill needs 10-15% more material
- Underestimating hauling — round-trip time is often 30-60 minutes
- Not calling 811 (Call Before You Dig) — underground utilities are common
- Skiping dewatering planning — water table issues can double costs
Pro Tips
- Keep topsoil separate — it is valuable for landscaping restoration
- Stockpile excavated material on-site if space allows for backfill savings
- Use geotextile fabric between backfill layers to prevent soil migration
- Compact in 8-12 inch lifts — thicker lifts won't achieve required density
- Wet soil during compaction for optimal density (but not over-saturated)
- Always have a spotter when working near utilities or structures
- Check weather — rain can flood open excavations and destabilize walls
- Document everything — photos of conditions protect against disputes
Drag to rotate — Scroll to zoom
相关计算器
Frequently used together on the same project.
Client & Quote (prints on PDF & Excel)
Adjustments (applies to exports)
Contingency is added as a separate line on the exported cost summary. Waste % is printed as an advisory reminder.
Project notes (prints on PDF & Excel)
Result compare (A/B)
| Item | Pinned | Current | Change |
|---|---|---|---|
Saved rates auto-apply from your Price Library. Advanced details stay in your browser — nothing is uploaded except inside your own PDF/Excel exports.
我们的免费在线 土方开挖 计算器可以精确计算您的建筑项目所需的材料数量。无论您是需要earth volume and trucks的计算器,此工具都可以处理。输入您的项目尺寸即可获得即时结果。
📖 如何使用此 土方开挖 计算器
如何使用此 {c} 计算器
📐 理解土方开挖公式
基本公式是:体积 = 长度 × 宽度 × 深度。所有尺寸必须使用相同单位。在得到体积后,转换为所需的单位并加上损耗系数。
⚠️ 应避免的常见错误
估算时未将英寸转换为英尺
✓ 确保所有尺寸使用相同单位。
忽略损耗系数
✓ 始终添加5-10%。
材料计算不准确
✓ 请使用我们的计算器获得精确的数量。
💡 专业提示
始终订购超出计算量的材料。
检查当地建筑规范。
提前订购材料。
❓ 常见问题
输入您的项目尺寸,即可获得材料数量和成本估算。
是的,本计算器适用于各种规模的项目。
🏗️ 实际应用
我们的土方开挖计算器适用于各种建筑项目。无论是小型修补还是大型施工,此工具都提供准确的估算。
我们的免费土方开挖计算器是估算earth volume and trucks最准确的在线工具。
✅Method, Sources & Review
Maintained by theBuildingCalc methods desk· Last reviewedSeptember 23, 2026. This calculator implements the standards and references below; every figure can be rechecked against the formulas and worked example on this page.
Results are estimates, not engineering advice. Verify against local codes and licensed professionals for structural, electrical, and gas work. See ourTerms. Spotted an error? Report it— corrections ship with the next review.