🚚 Backfill Calculator PRO

Excavation volume, compaction, truck sizing, hauling & cost — all in one.

Advertisement
Ad space — activates after AdSense approval

Dimension Diagram — updates as you type

Excavation pit section view. Length × width gives the plan area; depth plus over-excavation gives the dig volume.

V = L × W × D  →  ÷ 27 = cu yd

1 Project Info

2 Excavation Dimensions

3 Material & Compaction

Density—
Swell Factor—
Shrinkage—
Loose Dense

Typical: Native 10-15%, Gravel 15-25%, Sand 10-20%, Clay 15-30%

4 Truck Sizing

5 Cost

Results

Excavation Volume

Cubic Feet—
Cubic Yards—
Cubic Meters—

Backfill Volume

Compacted Volume—
Loose Volume—
Weight—

Hauling

Truck Trips Needed—
Truck Capacity—
Material Cost—
Haul Cost—
Labour Cost—

Grand Total—

⚠️ Pre-Export Checklist

  • Pit dimensions verified on-site before ordering
  • Over-excavation allowance matches soil conditions
  • Swell and shrinkage factors match lab soil report
  • Compaction method and lift thickness planned
  • Truck access and tipping area confirmed
  • Spoil disposal or reuse location arranged

Professional Backfill Estimation Guide

Show formulas, worked examples & pro tips ▼

Formulas

Excavation Volume = Length × Width × Depth

Backfill Volume= Excavation Volume × (1 + Compaction Rate / 100)

Compacted Volume= Excavation Volume × (1 - Shrinkage / 100)

Truck Trips = Backfill Volume / Truck Capacity

Total Cost= (Material Cost × Volume) + (Haul Cost × Trips) + Labour

Worked Example

20 ft × 10 ft × 4 ft excavation, Gravel backfill, 10 cu yd truck:

  • Volume: 20 × 10 × 4 =800 cu ft = 29.6 cu yd
  • With 20% compaction: 29.6 × 1.20 = 35.5 cu yd loose
  • Truck trips: 35.5 / 10 = 4 trips
  • Material: 35.5 × $25 = $887.50
  • Haul: 4 × $150 = $600.00

Material Types

MaterialDensity (lb/cu yd)Swell %Best For
Native Soil2,60015-25%General backfill
Gravel2,70012-20%Drainage, structural fill
Sand2,40010-15%Pipe bedding, fine fill
Clay Mix2,70020-35%Liner, moisture barrier

Pro Tips

  • Compact in 6-12 inch lifts for optimal density
  • Wet soil slightly during compaction for better results
  • Use geotextile fabric between different soil layers
  • Keep topsoil separate for landscaping restoration
  • Check moisture content — too wet or too dry reduces compaction
🏗️

Backfill — 3D Preview

Drag to rotate — Scroll to zoom

Excavation: × ×
Backfill Volume:cu yd
Compaction:%
Legend
Native Soil
Backfill
Ground Level
Dimensions

Client & Quote (prints on PDF & Excel)

Adjustments (applies to exports)

Contingency is added as a separate line on the exported cost summary. Waste % is printed as an advisory reminder.

Project notes (prints on PDF & Excel)

Result compare (A/B)

Item Pinned Current Change

Saved rates auto-apply from your Price Library. Advanced details stay in your browser — nothing is uploaded except inside your own PDF/Excel exports.

Advertisement
Ad space — activates after AdSense approval

Dolu, temeller, fore kazik duvarlari, servis hendekleri ve diger yeralti yapilarinin etrafindaki kazilmis alanlara toprak veya tanecikli malzeme geri koyma surecidir. Dogru dolgu hesabi her insaat projesi icin onemlidir.

Dolu hesaplama sureci dikkatle ele alinmasi gereken birkac ana degisken icerir. Kazilmis hacim baslangic noktasidir, ancak cevreleyen yapinin hacmini de hesaba katmalisiniz.

Yogunlastirma sirasindaki toprak davranisi baska bir karmasiklik katmani ekler. Kazilmis toprak gevsemis haldeyken yuzde 15 ile 30 arasinda genisler.

📖 Dolgu Miktarlari Nasil Hesaplanir

1

Kazim Olcutlerini Olcun

Kazimin uzunlugu, genisligi ve derinligini kaydedin.

2

Yapi Hesabini Hesaplayin

Kazim icindeki tum yapi elemanlarinin hacmini belirleyin.

3

Bosluk Hacmini Belirleyin

Yapi hacmini kazim hacminden cikararak net boslugu bulun.

4

Dolgu Malzemesi Secin

YapIsal gereksinimlere ve drenaj ihtiYAcIaRIna gORE uygun dolgu malzemesini secin.

5

Yogunlastirma Faktorlerini UygulayIn

Secilen malzemenin contracts faktorunu kullanarak bosluk hacmini gerekli malzeme miktarina donusturun.

6

Yogunlastirma Katmanlarini PlanlayIn

Maksimum kat kalinligina bagli olarak yogunlastirma kat sayisini belirleyin.

📐 Dolgu Hesaplama Formulleri

Temel formul: Net Dolgu Hacmi = Kazim Hacmi - Yapi Hacmi. 12 m x 0.6 m x 1.2 m'lik bir hendege, kazim hacmi 8.64 m3'tur. Yapi 3.6 m3 ise, net bosluk 5.04 m3'tur.

Contracts faktoru uygulayarak: Gerekli Malzeme = Net Dolgu / (1 - Contracts Faktoru). Yuzde 15 contracts faktoru ile toprak icin 5.93 m3 gevsek malzeme gerekir.

⚠️ Dolgu Hesaplamalarinda Yaygin Hatalar

✕

Kazilmis topragin genislemesini hesaba katmamak

✓ Kazilmis toprak orijinal hacimden yuzde 15 ile 30 arasinda genisler.

✕

Boru ve tesisat yer degisikliklerini gormezden gelmek

✓ Yer alti borulari hendekte onemli bir hacim isgal eder.

✕

Yanlis kat kalinligi kullanmak

✓ Ekipmanin etkili yogunlastiramayacagi kalinliklarda dolgu koymayin.

✕

Malzemeyi uygulamayla eslestirmemek

✓ Drenaj borulari etrafindaki ince taneli toprak suyu hapseder.

💡 Profesyonel Dolgu Ipucu

✓

Yogunlastirmadan once dolgu malzemesinin nem icerigini test edin.

✓

Nukleer yogunluk olcer veya kum koni testi ile yogunlastirmayi dogrulayin.

✓

Dolgu temel duvarinin her iki tarafina simetrik olarak yerlestirin.

✓

YapIsal dolgu icin hicbir zaman organik toprak veya donmus malzeme kullanmayin.

✓

Her yeni malzeme turu icin yogunlastirma seritleri kurun.

❓ Dolgu Hakkinda Sikca Sorulan Sorular

Bos hacim yogunlastirilmamis toprak miktaridir. Yogunlastirilmis hacim mekanik yogunlastirmadan sonraki topraktir.

200-300 mm standart kat kalinligi ile 7-10 yogunlastirma katina ihtiyac vardir.

Eger ozellikleri karsilarsa yeniden kullanilabilir. Yuksek plastisiteli toprak ve organik toprak kullanilmaz.

Dar alanlarda titresimli plakalar, buyuk alanlarda silindirler iyi calisir.

En az yuzde 95 standart Proctor yogunlugunda yogunlastirin.

Toprak turune gore degisir. Killi toprak yuzde 12-18, kum yuzde 8-12, cakil yuzde 6-10.

🏗️ Pratik Dolgu Ornekleri

Gercek senaryolardaki dolgu hesaplamalarini anlamak, malzeme siparislerini dogru planlamaya yardimci olur.

Senaryo 1: Konut Temel Hendegi. 50 m uzunlugunda hendege, kazim hacmi 37.5 m3. Yapi hacmi 12 m3. Net bosluk 25.5 m3. Contracts faktoru ile 30.6 m3 malzeme gerekir.

Dolu hesaplayicimiz temel hendekleri, fore kazik duvarlari ve servis hendekleri icin dogru hacim tahminleri saglar.

✅Method, Sources & Review

Maintained by theBuildingCalc methods desk· Last reviewedSeptember 23, 2026. This calculator implements the standards and references below; every figure can be rechecked against the formulas and worked example on this page.

ASTM D698 (compaction) OSHA excavation standards

Results are estimates, not engineering advice. Verify against local codes and licensed professionals for structural, electrical, and gas work. See ourTerms. Spotted an error? Report it— corrections ship with the next review.