🚚 Backfill Calculator PRO
Excavation volume, compaction, truck sizing, hauling & cost — all in one.
Dimension Diagram — updates as you type
Excavation pit section view. Length × width gives the plan area; depth plus over-excavation gives the dig volume.
1 Project Info
2 Excavation Dimensions
3 Material & Compaction
Typical: Native 10-15%, Gravel 15-25%, Sand 10-20%, Clay 15-30%
4 Truck Sizing
5 Cost
Results
Excavation Volume
Backfill Volume
Hauling
⚠️ Pre-Export Checklist
- Pit dimensions verified on-site before ordering
- Over-excavation allowance matches soil conditions
- Swell and shrinkage factors match lab soil report
- Compaction method and lift thickness planned
- Truck access and tipping area confirmed
- Spoil disposal or reuse location arranged
Professional Backfill Estimation Guide
Show formulas, worked examples & pro tips ▼
Formulas
Excavation Volume = Length × Width × Depth
Backfill Volume= Excavation Volume × (1 + Compaction Rate / 100)
Compacted Volume= Excavation Volume × (1 - Shrinkage / 100)
Truck Trips = Backfill Volume / Truck Capacity
Total Cost= (Material Cost × Volume) + (Haul Cost × Trips) + Labour
Worked Example
20 ft × 10 ft × 4 ft excavation, Gravel backfill, 10 cu yd truck:
- Volume: 20 × 10 × 4 =800 cu ft = 29.6 cu yd
- With 20% compaction: 29.6 × 1.20 = 35.5 cu yd loose
- Truck trips: 35.5 / 10 = 4 trips
- Material: 35.5 × $25 = $887.50
- Haul: 4 × $150 = $600.00
Material Types
| Material | Density (lb/cu yd) | Swell % | Best For |
|---|---|---|---|
| Native Soil | 2,600 | 15-25% | General backfill |
| Gravel | 2,700 | 12-20% | Drainage, structural fill |
| Sand | 2,400 | 10-15% | Pipe bedding, fine fill |
| Clay Mix | 2,700 | 20-35% | Liner, moisture barrier |
Pro Tips
- Compact in 6-12 inch lifts for optimal density
- Wet soil slightly during compaction for better results
- Use geotextile fabric between different soil layers
- Keep topsoil separate for landscaping restoration
- Check moisture content — too wet or too dry reduces compaction
Backfill — 3D Preview
Drag to rotate — Scroll to zoom
Calculadoras de Construcao Relacionadas
Frequently used together on the same project.
Client & Quote (prints on PDF & Excel)
Adjustments (applies to exports)
Contingency is added as a separate line on the exported cost summary. Waste % is printed as an advisory reminder.
Project notes (prints on PDF & Excel)
Result compare (A/B)
| Item | Pinned | Current | Change |
|---|---|---|---|
Saved rates auto-apply from your Price Library. Advanced details stay in your browser — nothing is uploaded except inside your own PDF/Excel exports.
O reaterro e o processo de substituir solo ou material granular em areas escavadas ao redor de fundacoes, muros de contencao, valas de servicos e outras estruturas subterraneas. O calculo preciso de reaterro e essencial para todo projeto de construcao.
O processo de calculo de reaterro envolve varias variaveis-chave. O volume escavado e o ponto de partida, mas voce deve considerar o volume ocupado pela estrutura.
O comportamento do solo durante a compactacao adiciona outra camada de complexidade. Solos escavados se expandirao de 15 a 30 por cento.
📖 Como Calcular Quantidades de Reaterro
Meça Dimensoes de Escavacao
Registre o comprimento, largura e profundidade da escavacao.
Calcule Volume da Estrutura
Determine o volume de todas as estruturas dentro da escavacao.
Determine Volume do Vazio
Subtraia o volume da estrutura do volume de escavacao.
Selecione Material de Reaterro
Escolha o material de preenchimento apropriado com base nos requisitos estruturais.
Aplique Fatores de Compactacao
Converta o volume do vazio para quantidade de material necessaria.
Planeje Capas de Compactacao
Determine o numero de capas com base na espessura maxima.
📐 Formulas de Calculo de Reaterro
A formula fundamental e: Volume Liquido de Reaterro = Volume de Escavacao - Volume da Estrutura. Para uma vala de 12 m x 0.6 m x 1.2 m, o volume de escavacao e 8.64 m3. Se a estrutura ocupa 3.6 m3, o vazio liquido e 5.04 m3.
Aplicando o fator de retracao: Material Necessario = Volume Liquido / (1 - Fator de Retracao).
⚠️ Erros Comuns no Calculo de Reaterro
Nao considerar expansao do solo escavado
✓ Solo escavado se expande de 15 a 30 por cento.
Ignorar deslocamentos de tubulacoes
✓ Tubulacoes subterraneas ocupam volume significativo.
Usar espessura de capa incorreta
✓ Nao coloque reaterro em capas mais grossas que o equipamento pode compactar.
Nao combinar material com aplicacao
✓ Solo fino ao redor de tubos de drenagem prende agua.
💡 Dicas Profissionais de Reaterro
Teste o conteudo de umidade antes da compactacao.
Use um medidor de densidade nuclear ou teste de funil de areia.
Coloque reaterro simetricamente em ambos os lados da fundacao.
Nunca use solos organicos ou material congelado como reaterro estrutural.
Instale faixas de teste de compactacao para cada novo tipo de material.
❓ Perguntas Frequentes sobre Reaterro
Volume solto e solo nao compactado. Volume compactado e apos compactacao mecanica.
Com espessuras de 200 a 300 mm, sao necessarias 7 a 10 capas.
Solo escavado pode ser reutilizado se atender as especificacoes.
Placas vibratorias funcionam bem em areas confinadas, rolos em areas abertas.
Compacte a pelo menos 95 por cento da densidade Proctor padrao.
Varia por tipo de solo. Argila a 12-18 por cento, areia a 8-12 por cento.
🏗️ Exemplos Praticos de Reaterro
Entender os calculos de reaterro ajuda a planejar pedidos de materiais com precisao.
Cenario 1: Vala de Fundacao Residencial. Vala de 50 m, volume de escavacao 37.5 m3. Volume da estrutura 12 m3. Vazio liquido 25.5 m3. Material necessario 30.6 m3.
Nossa calculadora de reaterro fornece estimativas precisas para valas de fundacao, muros de contencao e valas de servicos.
✅Method, Sources & Review
Maintained by theBuildingCalc methods desk· Last reviewedSeptember 23, 2026. This calculator implements the standards and references below; every figure can be rechecked against the formulas and worked example on this page.
Results are estimates, not engineering advice. Verify against local codes and licensed professionals for structural, electrical, and gas work. See ourTerms. Spotted an error? Report it— corrections ship with the next review.